Pave Daytona?

February 15, 2010 by · 28 Comments
Filed under: Daytona 500 

Is it Time to Re-pave Daytona?

The last time Daytona International Speedway was re-paved Jimmy Carter was President, and the No. 1 song was Night Fever by the Bee Gees. That was 1978.

Workers repair Daytona track

Time and weather finally took a toll on the racing surface in Sunday’s Daytona 500 when a hole in the track caused the race to be red flagged twice for over 2 hours.

There are at least 2 good reasons why Daytona has not been re-paved since:

One – The rough and bumpy surface brings both handling and speed into play as the keys to winning, and makes for some great racing.

Two – It would cost $20 million to re-pave the historic 2.5 mile speedway.

Do you think the track should be re-paved?

Photo Courtesy NASCAR Media